The London Underground community could possibly be getting at the least two new stations if improve proposals are given the inexperienced mild.
Transport for London (TfL) is at the moment contemplating additions to the Bakerloo Line, which might see the route – which at the moment stretches from Harrow & Wealdstone right down to Elephant & Citadel – prolonged, so it reaches additional into south London.
As TfL stays in discussions over a funding package deal for the extensions, right here’s what it is advisable to know concerning the proposal.
The place would the brand new stations be?
TfL
If the proposal is accepted – and crucially, funded – then work will start on two utterly new stations in southeast London: one in Burgess Park and one other on Outdated Kent Street.
The road would then lengthen to current stations at New Cross Gate and Lewisham, linking them as much as the Tube community.
Elephant and Citadel station would get an improve too, with a brand new Bakerloo line ticket corridor being put in, TfL has mentioned.
When may the brand new stations be constructed?
We’re sorry to be the bearers of dangerous information, but when the proposals are accredited, then there’ll nonetheless be a protracted wait forward.
TfL has mentioned development may begin within the 2030s, with the goal of getting the extension up and working by 2040.
Are there some other TfL upgrades within the pipeline?
Away from the Tube community, TfL can be weighing up whether or not to increase the DLR.
If accredited, the challenge would see the road prolonged throughout the Thames, with new stations at Beckton Riverside and in Thamesmead, which might be linked by a tunnel.
TfL
As with the Bakerloo Line proposal, this challenge is at the moment awaiting authorities approval.
TfL is hoping to safe funding to begin development in 2028 and open the stations to clients within the early 2030s.
Supply hyperlink